Sign In | Join Free | My himfr.com
Home > High Head Water Turbine >

Single Nozzle 1000kw High Head Water Turbine 1000RPM For Off Grid

Hongya Power Generating Equipment To Utilities Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Single Nozzle 1000kw High Head Water Turbine 1000RPM For Off Grid from wholesalers
     
    Buy cheap Single Nozzle 1000kw High Head Water Turbine 1000RPM For Off Grid from wholesalers
    • Buy cheap Single Nozzle 1000kw High Head Water Turbine 1000RPM For Off Grid from wholesalers
    • Buy cheap Single Nozzle 1000kw High Head Water Turbine 1000RPM For Off Grid from wholesalers

    Single Nozzle 1000kw High Head Water Turbine 1000RPM For Off Grid

    Ask Lasest Price
    Brand Name : Wawushan
    Model Number : CJA-020
    Price : negotiable
    Payment Terms : T/T
    Supply Ability : 1+unit+4 months
    Delivery Time : 180 wordking days
    • Product Details
    • Company Profile

    Single Nozzle 1000kw High Head Water Turbine 1000RPM For Off Grid

    Horizontal 1000kw Off Grid Hydro Power Water Turbine Generator For Micro Hydro Power Plant


    overview


    Turbine – generator unit

    The role of the turbine is to transform the energy of water, steam or wind into mechanical energy that will make the generator spin. The generator transforms the mechanical energy into electricity. In hydropower plants, this combination of generator and turbine is called a generating unit.


    Moving water makes the turbine spin


    In this generating unit, water rushes through the penstock and into the scrollcase. It turns the turbine blades and is then drawn to the turbine axis to exit through the underneath draft tube. The mechanical energy produced by the tremendous force that rushing water exerts on the turbine is transmitted to the generator, which then converts it into electrical energy.


    Driven by the turbine, the generator produces alternating current


    The generator is connected to the turbine drive shaft. It has a moving part–the rotor–and a fixed part–the stator. The rotor's outer surface is covered with electromagnets. The stator's inner surface, or cylinder wall, is made up of copper windings. When the rotor turns inside the stator, the electrons in the copper windings "vibrate." Their movement generates an electric current, similar to the one created by Michael Faraday in his 1831 experiment on electromagnetic induction, but on a much larger scale.


    Turbines have a constant rotation speed


    All the generating units in a power system must be synchronized. In other words, it's essential that they maintain an exact rotation speed. Why? To ensure adequate power quality. Equipment that runs on electricity is designed to use alternating current of a specific frequency. This frequency depends on the generating unit's rotation speed, i.e., the number of times per second that rotor magnets travel past the stator windings. This frequency is expressed in cycles per second, or hertz (Hz), named after the German physicist Heinrich Hertz, who proved the existence of radio waves.

    In North America, the standard alternating-current cycle is 60 times per second, but in Europe it is 50 times per second. This means that a clock designed to work at 60 Hz will be slower when plugged into a European socket.


    The package of Project


    a. Verification of documents submitted
    b. Audition of documents by the authority
    c. Signing the contract
    2. Engineering Design
    a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
    b. Design of overall layout and all the sub-systems within the parameter of power plant.
    c. Selection of personnel participating in the project
    d. Submission of technical solution to the commissioner for review and approval.
    3.Equipment Purchase& Transportation
    a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
    b. All the construction material, tools, spare parts and other necessities of the project
    4. Civil Construction
    a. All the civil construction work within the parameter of power plant
    5. Operation & Maintenance
    a. Operation of power plant (technical counseling)
    b.Regular maintenance and inspection
    c.Technical Training Program for Power Plant Personnel
    d.General Overhaul
    6. Installation & Testing
    a.Installation & testing for all systems & equipment provided by Runh Power
    b.Installation, testing & trail run of all systems of a power plant
    c.Installation, testing & trail run of entire power plant
    7. Supply of Spare Parts
    a. Long-term supply of spare parts and other consumibles.


    Specification


    NameHorizontal 1000kw Off Grid Hydro Power Water Turbine Generator
    Water Head110m
    Runner Diameters1.1m
    Capacity1000KW
    Frequency50HZ
    Generator Voltage400V
    Layout patternHorizontal
    Material(blades)Stainless Steel ZG0Cr13Ni4Mo
    ExcitationBrushless
    Generator InsulationF/F
    Lifespan50 years

    Why choose us?

    1. More than 20 years of industry experience, install commissioning more than 150 equipment each year

    2. Provide complete proposal for hydro power plant from water to wire

    3. Abundant foreign power plant project implementation experience such as France, Japan, USA, South Africa, Sri Lanka, Iran, Southeast Asia

    4. Design and manufacture of hydro power generator with voltage 400V,6.3KV . capacity exceed 1000kw with 400V


    FAQ


    1.You are a trading company or a manufacture?

    We are a hydro turbine generator manufacture with over 20 years of experiences, Our factory is in the Sichuan you will take 2 hours driving after you reach Shuangliu Airport, pay a visit to our factory you will know more about us.

    2.What Kind of water turbine should I choose?

    We need to know water head, flow rate, voltage level, frequency, on-grid or off-grid running, automation level from you to work out the solution

    3: Can you do the EPC for the hydro power plant?

    Yes, We can design, producing and install the equipment, we will dispatch technologist and workers to install the equipment.

    Quality Single Nozzle 1000kw High Head Water Turbine 1000RPM For Off Grid for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Hongya Power Generating Equipment To Utilities Limited
    *Subject:
    *Message:
    Characters Remaining: (0/3000)